Education | Madisonville, LA

Lancaster Elementary School

Overcoming challenges to complete project ahead of schedule.

DonahueFavret Contractors was selected in a public bid to construct the new elementary school for St. Tammany Parish School Board. The project had numerous challenges such as poor soils and a combination of structural types (steel and engineered cold formed trusses). All challenges aside, the project was completed in a 20 month timeframe, nearly 3 months ahead of schedule.

This 102,000 square foot project consisted of a 2-story administrative wing with counselors’ suite, teachers’ suite, full administrative offices, nurse’s station, and conference area. Five classroom wings each consisted of restrooms and teachers’ workroom. The project also included a Library, Cafetorium, Kitchen, Full Stage, and separate covered car and bus drop-offs.

The project was comprised of a brick and metal panel veneer and standing seam metal roof. The facility was designed to fit on a narrow site oriented east and west. High efficiency chill water systems, LED lights, materials with high recycle content, and low flush plumbing fixtures all work toward a sustainable facility.

This was one of the numerous projects completed for our longtime client, St Tammany Parish School Board.

  • Square Footage

    101,830 SF

  • Completion

    20 months (2011)

  • Owner

    St. Tammany Parish Public School System

  • Architect

    Gasaway, Gasaway, Bankston

  • Project Location

    Madisonville, LA