Hospitality | Baton Rouge, LA

Baton Rouge Marriott

Baton Rouge Marriott

This project consisted of a total gut and renovation of the interior public and back of house spaces at the Baton Rouge Marriott Hotel. The project was a fast-paced and phased project planned to accommodate the load and events of a fully functional hotel. The hotel remained open during the entire renovation.

Phase 1: Renovation and complete refit of the existing ballrooms, dining, kitchen, private dining, small meeting rooms, partial lobby.

The kitchen was fully renovated with new equipment, paint, flooring, and finishes. The ballrooms included new wall finishes, flooring, ornamental light fixtures, and dimming systems. All public space restrooms were re-finished with new stone and reconfigured for today’s ADA standards.

Phase 2: Included the temporary then final relocation of the check-in desk, renovation of the hotel’s meeting rooms, the reconfiguring and renovating of the second floor meeting spaces, and a renovation of the hotel fitness center.

  • Square Footage

    50,000 SF

  • Completion

    8 months

  • Owner

    Dimension Development Co.

  • Architect

    Trapolin-Peer Architects

  • Project Location

    Baton Rouge, LA

Interested in working with us on your next project?
Contact Us